Precision Turned 316L Stainless Steel Electrochemical Flow Plate 100mm Diameter Ra 0.4μm Flatness
Product Details:
| Place of Origin: | Guangdong, China |
| Brand Name: | KJT Precision |
| Certification: | ISO 9001:2015; SGS |
| Model Number: | KJT-19-STAINL |
Payment & Shipping Terms:
| Minimum Order Quantity: | 5 Pieces |
|---|---|
| Price: | USD 45-120 / Piece |
| Packaging Details: | VCI paper or individual PE bag, partitioned foam tray, export-grade corrugated carton with pallet |
| Delivery Time: | 15-20 working days for production |
| Payment Terms: | T/T, L/C, PayPal, Western Union |
| Supply Ability: | 500000 Pieces per Month |
|
Detail Information |
|||
| Material: | Stainless Steel 316L | Diameter: | 100mm |
|---|---|---|---|
| Flatness: | 0.05mm | Thickness: | 3mm |
| Channels: | 6 Concentric Grooves | Finish: | Electropolished Ra 0.4μm |
| Highlight: | Electrochemical Flow Plate 316L,Electropolished Flow Plate 100mm,Flat Ground Flow Plate |
||
Product Description
This electrochemical flow plate is machined from Stainless Steel 316L (316L (1.4404)) to ±0.03mm in the critical dimensions, then finished by Electropolished Ra 0.4μm. It is produced on CNC turning centres that are dedicated to small and medium volume precision work, so every dimension on the drawing is generated by the machine rather than by hand fitting. Typical users are engineers who have already been let down by a supplier that quoted a tolerance it could not hold, and who need the part to fit the first time without sorting or rework on the assembly line.
Key Features- Flatness For Stack Sealing: 0.05mm flatness over a 100mm face prevents cross port leakage in a compressed stack
- Electropolished Flow Channels: Electropolishing smooths channel walls and removes burrs that would disturb laminar flow
- Corrosion Resistant Base Metal: 316L resists the acidic and chloride electrolytes used in electrochemical cells
- Groove Depth Consistency: Channel depth is held within 0.02mm across the plate so flow distribution stays balanced
- Stack Height Control: Thickness tolerance ±0.03mm keeps the assembled stack height predictable
| Parameter | Specification |
|---|---|
| Diameter | 100mm |
| Flatness | 0.05mm |
| Thickness | 3mm |
| Concentric Grooves | 6 channels |
| Finish | Ra 0.4μm electropolished |
| Process | CNC turning, turn-mill and Swiss type options |
| Tolerance | ±0.03mm |
| Surface Finish | Electropolished Ra 0.4μm |
| Inspection | First article report, CMM sampling, 100 percent critical dimension check |
| Material Certificate | EN 10204 3.1 mill certificate with heat number traceability |
| Packing | VCI paper, foam tray, export carton and pallet |
The process route is fixed before metal is cut. Bar stock is verified against the purchase specification and the heat number is logged, then a first article is turned and measured in full. Only after the first article is signed off does the lot run. Critical features on this electrochemical flow plate are controlled to ±0.03mm with a process capability target of Cpk 1.33 or better, and the operator checks the feature at a defined frequency with the gauge stated on the control plan. Where the drawing calls for Electropolished Ra 0.4μm, the finishing step is carried out in house and the result is measured, not assumed. Sample parts go to the CMM for full dimensional verification, and the recorded results ship with the lot as a first article inspection report in PPAP level 3 format when a customer program requires it.
Questions are handled by engineers rather than by sales staff. Our team reviews each drawing for manufacturability, flags features that would drive cost without adding function, and proposes the tolerance band that actually matters for the assembly. That review is free and is returned within 24 hours together with a quotation. When a part fails in the field, we ask for the sample back, section it if needed and report what the failure mechanism was, because a supplier that cannot explain a failure cannot prevent the next one.
Factory Capability- Machines: 50+ CNC units including Swiss type lathes, 3, 4 and 5 axis machining centres and turn-mill centres from Citizen, Star, Doosan and Mazak.
- Quality lab: CMM, 2D vision measurement, roughness tester, hardness tester, salt spray chamber and spectral analyser for material verification.
- Team: 15+ mechanical engineers covering DFM review, process design, fixture design and failure analysis.
- Capacity: 500,000+ precision turned parts per month with stable output and on time delivery tracking.
- Quality system: ISO 9001:2015 certified, SGS audited, material traceability from mill heat to finished part.
- Export experience: parts shipped to 30+ countries across North America, Europe, Japan, Korea and Southeast Asia.
Electrochemical machining cells, PEM electrolyzer test fixtures, flow battery research stacks and analytical flow cells.
Packaging, Warranty And Service CommitmentsParts are degreased, dried and packed so that the surface finish specified above arrives intact. Standard packing is VCI paper or individual PE bag, a partitioned foam tray for form features, and an export grade corrugated carton on a pallet, with the lot number and heat number marked on the outside. Parts are warranted against material and workmanship defects for 12 months from delivery. If a part is found outside the drawing, we replace it at our cost and we pay the return freight for the defective lot. Third party inspection by SGS, BV or TUV can be arranged before shipment at your request, and we work under NDA where drawings are confidential.
Frequently Asked QuestionsQ: Can you machine flow channels on both faces? A: Yes. We machine both faces in a single fixturing with a datum flip, and check flatness after the second side.
Q: Is electropolishing compatible with tight groove depth control? A: Electropolishing removes 5 to 10μm uniformly. We account for that in the pre-polish depth so the final channel depth meets the drawing.
Q: Do you supply prototype quantities? A: Yes, single plates and small development lots are normal for this type of work. We quote tooling separately only when a custom fixture is required.
Q: What is the lead time for a development batch of 20 plates? A: Typically 15 to 18 working days including electropolishing and flatness inspection.
Inspection And Test Capability| Inspection Item | Capability |
|---|---|
| Coordinate Measurement | CMM with 0.001mm resolution, full dimensional report against the drawing |
| Surface Roughness | Bench and portable roughness testers covering the Ra 0.05 to 10μm range |
| Hardness | Rockwell and Vickers testers, heat treatment verified on every lot |
| Material Identity | Optical emission spectrometer check on each mill heat before machining |
| Plating Thickness | XRF gauge for layer thickness and composition, readings recorded |
| Corrosion Testing | Neutral salt spray chamber to ASTM B117, exposure up to 500 hours |
| Thread Verification | GO and NO-GO gauges plus pitch diameter measurement on threaded features |
| Report Package | FAIR, PPAP level 3, EN 10204 3.1 material certificate and heat treat record |
Q: How do you confirm the Stainless Steel 316L material before it is machined? A: Every bar is checked against its mill certificate with an optical emission spectrometer before it goes to a machine. If the chemistry does not match the grade, the bar is rejected and returned. The certificate for your lot is filed under the heat number and can be sent with the shipment or on request.
Q: What happens if a delivered part measures outside the ±0.03mm tolerance? A: Send the measurement and the lot number. We check the recorded values for that lot, replace the parts at our cost and cover the return freight. Because each critical feature is recorded during production, we can trace the deviation to a tool wear step, a fixture shift or a gauge issue and correct the process before the next lot runs.
Request A QuotationSend a 2D drawing, a STEP file or a sample and you will have a manufacturability review and a firm quotation within 24 hours. Trial orders from a single piece are accepted, so the tolerance claim can be checked on your own assembly before a production order is placed.




